When the trench is dug, include a concrete combination to the bottom from the trench (around 50mm) and go away to partly dry.Spot the sleepers: Spot the railway sleepers around the concrete in the specified position, ensuring that They can be evenly spaced and aligned.A bale can hold three to 5 gallons of drinking water. Anything over and above tha… Read More